Westmont Engineering was chosen to partner with Sievert Electric and Kalmar USA on the installation of 5 new box girder cranes. Each assembled crane stands 90 ft tall with two girders, each 10 ft tall x 5 ft wide x 250 ft long, and a 156,000 lb, 60 ft wide trolley running between the girders.